男友太凶猛1v1高h,大地资源在线资源免费观看 ,人妻少妇精品视频二区,极度sm残忍bdsm变态

 
 

Home/Our Business/Equipment Installation

Public Utility Installation at the Laxiwa Hydropower Station (China)

Updated: 2014-04-01

In terms of generating capacity, the Laxiwa Hydropower Station is the largest water power station on the upstream of the Yellow River. Its 750KV EHV power transmission equipment is the first of its kind in the world that has ever been installed in such a high-altitude cold region. Its gas-insulated metal-enclosed transmission lines with a 207-meter-drop in altitude are the first ever used in the world.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

主站蜘蛛池模板: 铜鼓县| 昌邑市| 涿州市| 济宁市| 平乐县| 平遥县| 商丘市| 阿瓦提县| 仁寿县| 仙桃市| 沙湾县| 林州市| 三穗县| 曲周县| 盐城市| 栾川县| 岳池县| 新竹市| 东光县| 东港市| 友谊县| 如东县| 新安县| 凌海市| 澄城县| 昌宁县| 汉源县| 电白县| 信宜市| 辰溪县| 通城县| 榆社县| 都江堰市| 江口县| 衡南县| 都昌县| 青阳县| 当涂县| 泉州市| 永靖县| 九寨沟县|