CGGC is capable of installing turbo-generator units, electrical and auxiliary equipment of four 1,000MW hydropower projects simultaneously and its business covers various types of turbines such as Francis, axial-flow, pumped storage, tubular, and Pelton.

In the Three Gorges Project, CGGC created a world record of installing and putting into operation four large units (700MW each) within one year; in recent years, CGGC has installed over 50% of China’s total hydropower capacity, and is the established leader in hydropower unit installation in China and even the world.

 

Electromechanical Equipment Installation in the Three Gorges Water Conservancy Project (China)

In the Three Gorges Project, CGGC installed and put into operation four units (700MW each) within just one year, creating a world record.

Read more

 

Electromechanical Equipment Installation in the Gezhouba Water Conservancy Project (China)

In the installation of Gezhouba Water Conservancy Project, CGGC created national records in three aspects: annual installed capacity, annual installed number of units and installation progress, and was thus awarded the National Science & Technology Progress Prize.

Read more

 

Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project (China)

In the Three Gorges Project, CGGC was responsible for installing all the metal structures and electromechanical equipment used for the permanent ship lock, which is of the largest scale, the most complex technology and the biggest difficulty in the world.

Read more

 

Electromechanical Equipment Installation at the Xiluodu Hydropower Station (China)

With a total installed capacity of 13860MW, the Xiluodu Hydropower station is currently China's second largest and the world's third largest hydropower station.

Read more

 

Electromechanical Equipment Installation at the Shuibuya Hydropower Station (China)

CGGC installed and commissioned all the four 460MW water-turbine generator units in the underground powerhouse, the utility systems, and the water inlet and spillway metal structures of the Shuibuya Hydropower Station.

Read more

 

Electromechanical Equipment Installation at the Geheyan Hydropower Station (China)

CGGC is the prime contractor for the four generator units at the Geheyan Hydropower Station, each having a single-unit capacity of 300MW.

Read more

 

Electromechanical Equipment Installation at the Longtan Hydropower Station (China)

CGGC was responsible for installing three homemade units (Nos. 5, 6 and 7 units) in the first phase of Longtan Hydropower Station Project.

Read more

 

Electromechanical Equipment Installation at the Pubugou Hydropower Station (China)

For the Pubugou Hydropower station, CGGC installed two of the six units and the entire utility system.

Read more

 


   Previous 1   

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

主站蜘蛛池模板: 绥阳县| 根河市| 收藏| 贵阳市| 米泉市| 开平市| 渝北区| 临沧市| 财经| 盖州市| 大英县| 应用必备| 青浦区| 会东县| 兴义市| 加查县| 浮梁县| 建阳市| 进贤县| 台北县| 汽车| 观塘区| 东丰县| 南雄市| 忻城县| 民权县| 汨罗市| 垦利县| 图们市| 库尔勒市| 大新县| 土默特左旗| 巨野县| 铜山县| 邢台市| 察哈| 明星| 湟中县| 星子县| 申扎县| 德保县|