男友太凶猛1v1高h,大地资源在线资源免费观看 ,人妻少妇精品视频二区,极度sm残忍bdsm变态

 
 

Home/News

CGGC-undertaken Nigerian Road Network Reconstruction Project completed

Updated: 2013-12-31

On December 10, CGGC-undertaken Nigerian road network reconstruction project in Lagos completed.

The project was started in March 2013 to renovate the 16 streets that have a total length of 10.39km and water supply and drainage pipelines in Mushin of Lagos.

In the past, all of the 16 streets in Mushin are earth roads, of which many sections are dilapidated and tend to be waterlogged, causing frequent traffic accidents. The completion of the project greatly improves local environment and transportation.

Many local residents dressed up for the handover ceremony held on December 10 to celebrate the completion of the project.

CGGC has successfully completed over 30 large-scale projects in foreign countries, including Ethiopian Tekeze Hydropower Station, Pakistani Neelum-Jeelum Hydropower Station, Cambodian Takemu Water Tower Project and Iranian Mollasadra Hydropower Station.

 

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

主站蜘蛛池模板: 中西区| 策勒县| 双桥区| 太白县| 琼海市| 黎城县| 大余县| 周至县| 马边| 海城市| 台中市| 博湖县| 鹿泉市| 监利县| 会同县| 张家界市| 南投县| 娱乐| 永年县| 安图县| 珲春市| 宿迁市| 肥西县| 台州市| 莲花县| 汾阳市| 威宁| 双流县| 德庆县| 上犹县| 基隆市| 天门市| 靖安县| 铁岭市| 策勒县| 威海市| 九龙城区| 商城县| 黄浦区| 鄂温| 平江县|