男友太凶猛1v1高h,大地资源在线资源免费观看 ,人妻少妇精品视频二区,极度sm残忍bdsm变态

US EUROPE AFRICA ASIA 中文
China / Society

Capital's subway system branches out

By Zheng Xin (China Daily) Updated: 2013-01-04 09:08

Unprecedented construction of Beijing's gigantic underground transit network is expected to alleviate traffic problems that have been haunting the metropolis for decades, reports Zheng Xin.

Capital's subway system branches out

A woman takes photos at Nanluoguxiang Station on Line 6 on Sunday. The station's decoration features the traditional folk art of Beijing. Wei Xiaohao / for China Daily

The Beijing Subway has seen unprecedented construction in recent years, greatly easing traffic congestion in the Chinese capital.

Including a new line and extensions to lines, the city boasts a network of 15 lines, covering 11 districts, with 221 stations and 442 km of track.

Wang Renqiang, a leading project official of the subway's Line 6 project department of the China Railway Tunnel Group, said once everything is operational, the updated network will make it easier for people to get around and provide relief to transport services on the ground.

The Beijing Subway is the busiest on the Chinese mainland in terms of passenger volume, and the largest in terms of operational length.

It is estimated the total operational length of the Beijing system will reach 1,050 km by the end of 2020, with 30 lines and some 450 stations, according to the Beijing government.

The four new services, which started operating on Dec 30, are Line 6, which connects the east and west of the capital; an extension to Line 10, which will form the capital's second loop line once finished; an extension to Line 8, which connects the city center and northern suburbs; and an extension to Line 9 to serve Beijing West Railway Station.

Capital's subway system branches out

Line 6 will eventually be 52 km long and boast 32 stations, according to the Beijing Municipal Commission of Transport. This involves three phases, with the entire route becoming operational by the end of 2015.

The first phase is 30.4 km long, with 20 underground stations, while the second will cover another 12.4 km, with seven stations.

According to the commission, the government has so far invested about 18.4 billion yuan ($3 billion) in Line 6, with some 16.6 billion yuan going into the first phase.

Capital's subway system branches out

The first phase runs from Wuluju in Haidian district in the west of the capital to Caofang in Chaoyang district in the east. Trains can accommodate 1,960 passengers on a single trip, more than can be carried on a single trip on any of the capital's other subway lines.

It is also the fastest line on the system, with trains running at a maximum speed of 100 kph, compared to the current highest speed of 80 kph. Trains will take 48 minutes to travel the whole line.

One of the reasons for the speed is that stations are far apart, with the longest distance between two consecutive stations being four km.

In addition to its capacity and speed, Line 6 also features the deepest station on the system, with the connection to Dongsi Station on Line 5 being 34 meters underground.

The city's subway system is under considerable pressure, with serious overcrowding during rush hours, partly because of the ticket price of just 2 yuan (31 cents) regardless of the length of journey.

Contact the writer at zhengxin@chinadaily.com.cn

Highlights
Hot Topics

...
主站蜘蛛池模板: 周口市| 绥中县| 莆田市| 英山县| 曲沃县| 丰宁| 平定县| 淮滨县| 邵阳县| 阳东县| 天等县| 上林县| 武隆县| 安龙县| 渝中区| 嘉禾县| 南阳市| 临海市| 临湘市| 固安县| 通山县| 阳原县| 阿克苏市| 揭阳市| 台安县| 彭泽县| 浮梁县| 金湖县| 视频| 通海县| 义乌市| 安平县| 惠水县| 枣庄市| 苏尼特左旗| 开化县| 色达县| 建德市| 乌苏市| 宁德市| 宜兰市|