男友太凶猛1v1高h,大地资源在线资源免费观看 ,人妻少妇精品视频二区,极度sm残忍bdsm变态

Global EditionASIA 中文雙語Fran?ais
World
Home / World / Europe

Laying of last pipe of Nord Stream 2 pipeline completes

Xinhua | Updated: 2021-09-07 09:59
Share
Share - WeChat
This picture posted on the website of Russian energy giant Gazprom shows Nord Stream 2 pipe-laying operations in German territorial waters.

MOSCOW - The last pipe of the two strings of the Nord Stream 2 pipeline was welded, Nord Stream 2 AG, the operating company, said in a press release Monday.

"On September 6, 2021, specialists on the laybarge Fortuna welded the last pipe of the two strings of the Nord Stream 2 Pipeline," the company said.

"As the next step, the section of the pipe coming from the German shore will be connected to the section coming from the Danish waters in a so-called above water tie-in," it added.

The company intends to put the Nord Stream 2 gas pipeline into operation before the end of the year. It said the project will ensure gas supply security and reliability, and "contribute to meeting long-term needs of the European energy market for gas imports."

The 1,230-km gas pipeline would bring 55 billion cubic meters of gas annually from Russia to Germany through the Baltic Sea.

Most Viewed in 24 Hours
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
主站蜘蛛池模板: 兴义市| 河北省| 三穗县| 枣阳市| 灌阳县| 梧州市| 东安县| 上杭县| 兰州市| 镇巴县| 阜新市| 五常市| 会同县| 南川市| 大新县| 兴海县| 长丰县| 仙游县| 古交市| 冷水江市| 嵊州市| 临夏县| 蚌埠市| 平果县| 且末县| 玉门市| 汾西县| 泽州县| 油尖旺区| 开阳县| 瑞昌市| 伊川县| 金山区| 库尔勒市| 乌兰察布市| 滦平县| 加查县| 什邡市| 防城港市| 朝阳市| 常宁市|