男友太凶猛1v1高h,大地资源在线资源免费观看 ,人妻少妇精品视频二区,极度sm残忍bdsm变态

Eight things you need to know about Hong Kong-Zhuhai-Macao Bridge

By He Shusi | chinadaily.com.cn | Updated: 2018-10-23 15:14
Share
Share - WeChat
The bridge seen during construction in November 2017. [Photo by ROY LIU/CHINA DAILY]

6. When did construction start? What was the cost?

The plan to build a link road across the Pearl River Estuary was first initiated by Hong Kong industrialist Gordon Wu Ying-sheung in 1983. After several twists and turns, the Feasibility Study started in March 2004 under State Council's approval. The study report was approved in October 2009, followed by a commencement ceremony on Dec 15 in the same year, chaired by then-vice-premier Li Keqiang in Zhuhai.

So far, the total cost of HZMB is about 120 billion yuan ($17.4 billion), of which the 29.6-km Main Bridge invested by three governments is about 48.1 billion yuan. The rest are investments by individual governments on their ports and link roads to the Main Bridge.

The cost allocation among the three governments shown as above is settled by the assessment of economic benefits they can get after the bridge opens.

|<< Previous 1 2 3 4 5 6 7 8 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
主站蜘蛛池模板: 时尚| 南涧| 扶沟县| 临湘市| 台南市| 馆陶县| 博客| 永仁县| 双峰县| 曲沃县| 南岸区| 漠河县| 阿克陶县| 木兰县| 南岸区| 昌宁县| 肇州县| 大田县| 年辖:市辖区| 旬邑县| 中卫市| 太仆寺旗| 莱阳市| 凤凰县| 博爱县| 康马县| 栾城县| 娱乐| 卢湾区| 吉林省| 台南县| 乌兰察布市| 太保市| 拜城县| 灵台县| 兰坪| 陈巴尔虎旗| 丰县| 运城市| 九龙城区| 达日县|