男友太凶猛1v1高h,大地资源在线资源免费观看 ,人妻少妇精品视频二区,极度sm残忍bdsm变态

Global EditionASIA 中文雙語(yǔ)Fran?ais
China
Home / China / Innovation

Cold functional test starts at China's first Hualong One nuclear project

Xinhua | Updated: 2019-04-27 20:13
Share
Share - WeChat

FUZHOU -- Cold functional tests began Saturday on a reactor of China's first nuclear power project using Hualong One technology, a domestically developed third-generation reactor design.

The test was conducted on a circuit of the No. 5 nuclear power unit in the city of Fuqing, eastern China's Fujian Province, to evaluate the performance of the circuit system and its supporting facilities under high-pressure conditions, according to the China National Nuclear Corporation (CNNC).

The CNNC said the test started 50 days ahead of schedule.

Hualong One reactors were jointly designed by two nuclear power giants, China General Nuclear Power Group and the CNNC, and passed inspection by a national panel in August 2014.

China has since approved the use of Hualong One technology to build two reactors in Fujian, the No. 5 and No. 6 units.

Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
主站蜘蛛池模板: 禹州市| 邳州市| 屏东市| 布尔津县| 布拖县| 石门县| 蒙阴县| 平利县| 堆龙德庆县| 夏河县| 瓦房店市| 绥棱县| 徐州市| 延寿县| 弋阳县| 石棉县| 乐亭县| 饶阳县| 通榆县| 磴口县| 新疆| 宁安市| 南城县| 花垣县| 溆浦县| 许昌县| 丰台区| 永寿县| 潼关县| 徐州市| 迁安市| 远安县| 抚顺县| 水富县| 桦南县| 普宁市| 安吉县| 安泽县| 桂林市| 基隆市| 微山县|